Line TP-371 replacement: PA, 2016/2017. Install 10 miles of new 20” pipeline and take-up/abandon 10 miles of 12”.Work includes MLV settings, Launcher assembly, station piping and tie-ins.
Install 12,000 LF – 24” Steel Line, two each 12’000 LF HDPE water Lines connecting well pads in Lewis County, WV. Work included fabrication and installation of launchers/receivers, tie-in valve assemblies and well tie-in assemblies.
Install 10,500 LF – 24” Steel Line, two each 10,500 LF HDPE water Lines and connecting to well pads in Lewis County, WV. Work included
fabrication and installation of launchers/receivers, MLV’s, tie-in valve assemblies and well site tie-ins. Total for 2021 projects: (14 Million)
LEAP project and CL-01 – Replace/Install 6” and 8” steel gas lines at 5
locations in Marlboro, Chesterfield and Darlington Counties SC. Total
footage: 1,200 LF. of 6” and 11,300 LF of 8”.
TL-653 Tri-West Project. Install 9,200 ft. of 20” steel pipeline, fabricate
and install 24” launcher assembly, and crossover assemblies to two – 24” lines. Install CP system: anodes, rectifier, deep well ground bed etc.
Tuscarawas Cunty, Ohio